 Hermosa Beach Pier |
|
|

In this particular case all the modular tanks were delivered in flat format to be assembled on site to the desired size.
|
|
 The oversize hole was dug, the base properly compacted, the geotextile was place in the hole with a big overlap to later cover the full tank as you can see in the next pictures |